LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2012 >> LS 600hL >> Repair and Diagnosis >> External Pages >> Different car >> Section 64 (Power Distribution (Service Information)) >> Power Management Control Ecu >> Installation >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Power Management Control Ecu: Installation: Installation

WARNING: This page is about a different car, the 2012 Lexus CT 200h. However, it is still accessible from the selected car via links, so may be relevant.
  1. INSTALL POWER MANAGEMENT CONTROL ECU 
    1. Engage the 2 claws to install the power management control ECU as shown in the illustration.
      Fig 1: Identifying Power Management Control And Claws
      GTY348098Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. INSTALL ECU INTEGRATION BOX RH 
    1. Install the ECU integration box RH with the 2 nuts and bolt.
    2. Engage the clamp to connect the wire harness.
    3. Connect each connector.
  3. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY  . Refer to INSTALLATION - Step 22
  4. INSTALL LOWER NO. 2 INSTRUMENT PANEL AIRBAG ASSEMBLY  . Refer to INSTALLATION - Step 1
  5. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY  . Refer to INSTALLATION - Step 26
  6. INSTALL INSTRUMENT SIDE PANEL RH  . Refer to INSTALLATION - Step 27
  7. INSTALL COWL SIDE TRIM SUB-ASSEMBLY RH 

    HINT: 

    Use the same procedure as for the LH side. Refer to INSTALLATION - Step 43 .

  8. INSTALL FRONT DOOR SCUFF PLATE RH 

    HINT: 

    Use the same procedure as for the LH side. Refer to INSTALLATION - Step 44 .

  9. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 
    NOTE:

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected. Refer to INITIALIZATION .

  10. INSTALL REAR FLOOR BOARD UPPER NO. 3 PLATE  . Refer to INSTALLATION - Step 70
  11. INSTALL DECK FLOOR BOX RH  . Refer to INSTALLATION - Step 71
  12. INSTALL REAR NO. 3 FLOOR BOARD  . Refer to INSTALLATION - Step 72
  13. INSTALL REAR DECK FLOOR BOX  . Refer to INSTALLATION - Step 73
  14. INSTALL REAR NO. 2 FLOOR BOARD  . Refer to INSTALLATION - Step 74
  15. PERFORM DIAGNOSTIC SYSTEM CHECK 
    1. Perform diagnostic system check. Refer to DTC CHECK / CLEAR .
  16. INSPECT SRS WARNING LIGHT 

    Refer to DIAGNOSIS SYSTEM