LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Lexus >> 2021 >> LC 500h >> Repair and Diagnosis >> Suspension >> Suspension Control Systems >> Suspension Control System - Service Information >> Front Acceleration Sensor >> Installation [01/2017 - 05/2023] >> Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation [01/2017 - 05/2023]: Procedure

  1. INSTALL ACCELERATION SENSOR 
    1. for LH side:
      1. Install the acceleration sensor with the 2 nuts.

        Torque: 5.5 N.m (56 kgf/cm, 49 in.lbf) 

        NOTE:
        • Avoid any impact to the acceleration sensor.
        • Do not drop the acceleration sensor. If it is dropped, replace it with a new one.
      2. Connect the connector.
      3. Return the floor carpet to its original position.
    2. for RH side:
      1. Install the acceleration sensor with the 2 nuts.

        Torque: 5.5 N.m (56 kgf/cm, 49 in.lbf) 

        NOTE:
        • Avoid any impact to the acceleration sensor.
        • Do not drop the acceleration sensor. If it is dropped, replace it with a new one.
      2. Connect the connector.
      3. Return the floor carpet to its original position.
  2. INSTALL FRONT DOOR OPENING TRIM COVER LH 

    Refer to PROCEDURE - Step 35 [01/2017 - 06/2019] , or refer to PROCEDURE - Step 35 [06/2019 - 04/2020] , or refer to PROCEDURE - Step 35 [04/2020 - 05/2023]

  3. INSTALL FRONT DOOR OPENING TRIM COVER RH 

    Refer to PROCEDURE - Step 34 [01/2017 - 06/2019] , or refer to PROCEDURE - Step 34 [06/2019 - 04/2020] , or refer to PROCEDURE - Step 34 [04/2020 - 05/2023]

  4. INSTALL FRONT DOOR SCUFF PLATE LH 

    Refer to PROCEDURE - Step 35 [01/2017 - 06/2019] , or refer to PROCEDURE - Step 35 [06/2019 - 04/2020] , or refer to PROCEDURE - Step 35 [04/2020 - 05/2023]

  5. INSTALL FRONT DOOR SCUFF PLATE RH 

    Refer to PROCEDURE - Step 36 [01/2017 - 06/2019] , or refer to PROCEDURE - Step 36 [06/2019 - 04/2020] , or refer to PROCEDURE - Step 36 [04/2020 - 05/2023]

  6. CONNECT CABLE TO NEGATIVE AUXILIARY BATTERY TERMINAL 

    Refer to PROCEDURE - Step 2

    NOTE:
  7. INSTALL NO. 2 DECK BOARD 

    Refer to PROCEDURE - Step 13 [01/2017 - 01/2021] , or refer to PROCEDURE - Step 13 [01/2021 - 05/2023]