LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Mazda
>>
1983
>>
B2000 Base
>>
Repair and Diagnosis
>>
Engine Performance
>>
Ignition System - MITSUBISHI Electronic
>>
Testing
>>
Secondary Wire Resistance Test
April 5, 2026:
LEMON Manuals is launched!
Read the announcement.
Secondary Wire Resistance Test
Test coil and spark plug cables with an ohmmeter. Do not puncture secondary wires when making the resistance check. Connect leads to each end of the cable.
Resistance should not exceed 16,000 ohms for each 39" 1m).