LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 1994 >> RX7 2RTR-1308cc 80 >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Relays and Modules - Computers and Control Systems >> Engine Control Module >> Testing and Inspection >> PCME Pin Tests
April 5, 2026: LEMON Manuals is launched! Read the announcement.

PCME Pin Tests







Inspection with Engine Signal Monitor
1. Connect the special service tools SSTs to the powertrain control module engine (PCME) as shown.

NOTE: Use connector A of the adapter to measure voltage at terminals 1A through lV and 3A through 3P, and use connector B to measure voltage at the terminals 2A through 2L and 4A through 4Z.

2. Place the SST (Sheet: 76-pin type) on the SST (Engine Signal Monitor).
3. Measure the voltage at each terminal.

See: PCME Terminal Voltage Charts.

4. If any PCME terminal voltage is incorrect, check the input or output device and related wiring. If they are normal, replace the PCME.

CAUTION: Applying voltage to SST terminals A or B will damage the SST.