Refrigerant Lines Installation Note
WARNING: This page is about a different car, the 2002 Mazda 626. However, it is still accessible from the selected car via links, so may be relevant.
- Tighten the nut using a spanner and a torque wrench, then install the cooler pipe or hose.
- Apply compressor oil to O-rings and connect the joint.
- When installing a new cooler pipe or hose, add SP-20 compressor oil into the refrigeration cycle.
Supplemental amount (approximate quantity)
10 ml {10 cc, 0.3 fl oz}