LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2005 >> MPV ES >> Repair and Diagnosis >> Engine Mechanical >> Auxiliary Emission Control Systems >> Emission System >> EGR Boost Sensor Solenoid Valve Inspection >> Circuit Open/Short Inspection >> Notes
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit Open/Short Inspection: Notes

  1. Disconnect the PCM connector. (See PCM REMOVAL/INSTALLATION .)
  2. Connect the SST  (104 Pin Breakout Box) to the PCM disconnected.
  3. Tighten the connector attaching bolt.

    Tightening torque 

    1. 7.9-10.7 N.m {80-110 kgf.cm, 69.5-95.4 in.lbf} 
    Fig 1: Connecting 104 Pin Breakout Box
    G03699944Courtesy of MAZDA MOTORS CORP.
  4. Inspect the following wiring harness for open or short (Continuity check).
    Fig 2: Identifying EGR Boost Sensor Solenoid Valve & Main Relay Harness Side Connectors
    G03699945Courtesy of MAZDA MOTORS CORP.