LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2011 >> RX-8 Grand Touring, 1.3 2 >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Neutral Switch Inspection >> Continuity Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Continuity Inspection

  1. Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION [13B-MSP] .)
  2. Disconnect the negative battery cable.
  3. Remove the neutral switch. (See NEUTRAL SWITCH REMOVAL/INSTALLATION .)
  4. Verify that the continuity between neutral switch terminals A and B is as indicated in the table.
Fig 1: Inspecting Neutral Switch
G05981122Courtesy of MAZDA MOTORS CORP.
CONTINUITY REFERENCE CHART

Measurement condition Continuity
Push the rod No continuity
Except above Continuity detected