Diagnostic Procedure
DOOR GLASS DIAGNOSTIC PROCEDURE
| Step | Inspection | Action | |
|---|---|---|---|
| 1 | POWER WINDOW MAIN SWITCH CONNECTOR INSPECTION
|
Yes | Go to the next step. |
| No | Repair or replace the connector, then go to Step 7. | ||
| 2 | POWER WINDOW MOTOR CONNECTOR INSPECTION
|
Yes | Go to the next step. |
| No | Repair or replace the connector, then go to Step 7. | ||
| 3 | VERIFY IF MALFUNCTION CAUSE IS POWER WINDOW MAIN SWITCH POWER SUPPLY CIRCUIT
|
Yes | Go to the next step. |
| No | Inspect the P.WINDOW1 30A fuse and P.WINDOW2 25A fuse.
Go to Step 7. |
||
| 4 | VERIFY IF MALFUNCTION CAUSE IS OPEN CIRCUIT IN WIRING HARNESS BETWEEN POWER WINDOW MAIN SWITCH AND BODY GROUND
|
Yes | Go to the next step. |
| No | Refer to the
wiring diagram and verify if there is a common connector between power window main switch terminal 2A and body ground. If there is a common connector:
If there is no common connector:
Go to Step 7. |
||
| 5 | POWER WINDOW MOTOR TERMINALS E AND F INSPECTION
|
Yes | Replace the power window motor, then go to Step 7. (See FRONT POWER WINDOW MOTOR REMOVAL/INSTALLATION .) |
| No | Go to the next step. | ||
| 6 | POWER WINDOW MAIN SWITCH TERMINALS 1J AND 1H INSPECTION
|
Yes | Refer to the
wiring diagram and verify if there is a common connector between the following terminals.
If there is a common connector:
If there is no common connector:
Go to the next step. |
| No | Replace the power window main switch, then go to the next step. (See POWER WINDOW MAIN SWITCH REMOVAL/INSTALLATION .) |
||
| 7 | VERIFY IF MALFUNCTION CAUSE IS CORRECTED
|
Yes | Troubleshooting completed. (Explain the problem to the customer.) |
| No | Verify the malfunction symptom in the symptom troubleshooting chart and perform the other applicable malfunction diagnosis. | ||