LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2014 >> 5 Touring >> Repair and Diagnosis >> Accessories & Equipment >> Cruise Control Systems >> Cruise Control Switch Inspection >> Standard Deployment Control System
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Standard Deployment Control System

  1. Remove the battery cover. (See BATTERY REMOVAL/INSTALLATION .)
  2. Disconnect the negative battery cable and wait for 1 min or more  .
  3. Remove the driver-side air bag module. (See DRIVER-SIDE AIR BAG MODULE REMOVAL/INSTALLATION [STANDARD DEPLOYMENT CONTROL SYSTEM] .)
  4. Disconnect the clock spring connector (part wiring harness-side).
  5. Inspect for resistance and continuity between clock spring connector terminals 4D and 4F (part wiring harness-side) using a tester.
    Fig 1: Cruise Control Switch Circuit Diagram (4D And 4F)
    G08150303Courtesy of MAZDA MOTORS CORP.
    Fig 2: Identifying Cruise Control Switch Connector Terminals (4D And 4F)
    G08150304Courtesy of MAZDA MOTORS CORP.
    Switch condition Resistance (ohm)
    Cruise OFF switch held at on Continuity
    CANCEL switch held at on 118.8-121.2
    SET (-) switch held at on 297.0-303.0
    SET (+) switch held at on 594.0-606.0
    RESUME switch held at on 1, 098.9-1, 121.1
    Cruise ON switch held at on 2, 088.9-2, 131.1
    Neutral 4, 266.9-4, 353.1
  6. Apply battery positive voltage to clock spring terminal 4O (part wiring harness-side) and terminal 4E (part wiring harness-side) to ground.
    Fig 3: Applying Battery Voltage And Ground To Clock Spring Terminals 4O, 4E
    G08150305Courtesy of MAZDA MOTORS CORP.
  7. Verify that the LED illuminates.