LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2015 >> CX-5 Touring, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 18 (Basic HVAC System) >> Refrigerant Line Removal/Installation >> Refrigerant Line Installation Note (2)
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Refrigerant Line Installation Note (2)

WARNING: This page is about a different car, the 2013 Mazda CX-5. However, it is still accessible from the selected car via links, so may be relevant.
  1. After replacing the refrigerant line, add compressor oil to the refrigeration cycle.
    • After replacing the cooler hose (HI)

      Supplemental oil amount (approx. quantity) 

      • 1 ml {1 cc, 0.03 fl oz}
    • After replacing the cooler hose (LO)

      Supplemental oil amount (approx. quantity) 

      • 3 ml {3 cc, 0.1 fl oz}
    • After replacing the cooler pipe

      Supplemental oil amount (approx. quantity) 

      • 1 ml {1 cc, 0.03 fl oz}