LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mini >> 2012 >> Cooper Base, 2D Convertible, Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 1266 (Engine Electrical System - Repair) >> Troubleshooting >> 12 00...Instructions for working on the ignition system
April 5, 2026: LEMON Manuals is launched! Read the announcement.

12 00...Instructions for working on the ignition system

WARNING: This page does not describe the selected car, but rather 10 other vehicles, including the 2010 BMW M6, 2010 BMW M5, 2009 BMW M6, 2009 BMW M5, and 2008 BMW M6. However, it is still accessible from the selected car via links, so may be relevant.
CAUTION:

Always switch off ignition before working on ignition system.

Use only test leads which have been approved and belong to these testing instruments (e.g. DIS Tester).

Comply with operating instructions of the respective testing instrument used.

Comply with the country-specific safety regulations.

Never touch components under current with engine running!

Comply with instructions of DIS tester.

Do not connect any suppression capacitors or inspection lamps to terminal 1 on the ignition coil.

Terminal 1 of ignition coil must not be connected to ground or battery positive lead.

If an alarm system is subsequently installed, lead of terminal 1 must not be used for start prevention.

When working on ignition system, always disconnect supply leads to ignition coils.

High tension! - High tension!

IMPORTANT: Hazardous voltages occur at: