LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2009 >> Sentra SE-R >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - DTCS U0101 To P0128 (Qr25DE) >> DTC P0011 IVT Control >> Component Inspection >> Intake Valve Timing Control Solenoid Valve
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Intake Valve Timing Control Solenoid Valve

  1. Disconnect intake valve timing control solenoid valve harness connector.
  2. Check resistance between intake valve timing control solenoid valve as follows.
    RESISTANCE REFERENCE CHART

    Terminal Resistance
    1 and 2 6.7 - 7.7Ω [at 20°C (68°F)]
    1 or 2 and ground ∞ Ω (Continuity should not exist.)

    If NG, replace intake valve timing control solenoid valve.

    If OK, go to next step.

    Fig 1: Checking Resistance Between Intake Valve Timing Control Solenoid Valve Terminals
    G04874916Courtesy of NISSAN MOTOR CO., U.S.A.
  3. Remove intake valve timing control solenoid valve.
  4. Provide 12 V DC between intake valve timing control solenoid valve terminals and then interrupt it. Check that the plunger moves as shown in the figure.
    CAUTION: Never apply 12 V DC continuously for 5 seconds or more. Doing so may result in damage to the coil in intake valve timing control solenoid valve.

    If NG, replace intake valve timing control solenoid valve.

    NOTE: Always replace O-ring when intake valve timing control solenoid valve is removed.
    Fig 2: Applying 12V DC Between Intake Valve Timing Control Solenoid Valve Terminals
    G04874917Courtesy of NISSAN MOTOR CO., U.S.A.