LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2009 >> Sentra SE-R >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 13 (Engine Control System - Component Testing (MR20DE-CALIFORNIA)) >> Service Data And Specifications (SDS) >> Idle Speed and Ignition Timing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Idle Speed and Ignition Timing

WARNING: This page is about a different variant/trim than selected.
IDLE SPEED AND IGNITION TIMING SPECIFICATION

Target idle speed CVT No load(1) (In P or N position) 700 ± 50 RPM
M/T No load(1) (in Neutral position) 675 ± 50 RPM
Air conditioner: ON CVT In P or N position 800 RPM or more
M/T In Neutral position
Ignition timing CVT In P or N position 6 ± 5° BTDC
M/T In Neutral position
(1) Under the following conditions:

  • Air conditioner switch: OFF
  • Electric load: OFF (Lights, heater fan & rear window defogger)
  • Steering wheel: Kept in straight-ahead position