LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2012 >> Sentra SE-R >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - DTCS U0101 To P0159 (Qr25DE) >> DTC P0011: IVT Control >> Component Inspection >> Intake Valve Timing Control Solenoid Valve
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Intake Valve Timing Control Solenoid Valve

  1. Disconnect intake valve timing control solenoid valve harness connector.
  2. Check resistance between intake valve timing control solenoid valve as follows.
    Terminal Resistance
    1 and 2 6.7 - 7.7 Ω [at 20°C (68°F)]
    1 or 2 and ground ∞Ω
    (Continuity should not exist.)
    Fig 1: Checking Resistance Between Intake Valve Timing Control Solenoid Valve Terminals 1 And 2
    G04874916Courtesy of NISSAN NORTH AMERICA, INC.

    If NG, replace intake valve timing control solenoid valve. Refer to , "REMOVAL AND INSTALLATION ".

    If OK, go to next step.

  3. Remove intake valve timing control solenoid valve. Refer to , "REMOVAL AND INSTALLATION ".
  4. Provide 12 V DC between intake valve timing control solenoid valve terminals and then interrupt it. Check that the plunger moves as shown in the figure.
CAUTION: Never apply 12 V DC continuously for 5 seconds or more. Doing so may result in damage to the coil in intake valve timing control solenoid valve.

If NG, replace intake valve timing control solenoid valve. Refer to , "INSPECTION AFTER INSTALLATION ".

NOTE: Always replace O-ring when intake valve timing control solenoid valve is removed.
Fig 2: Inspecting Plunger Movement
G04874917Courtesy of NISSAN NORTH AMERICA, INC.