LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Nissan-Datsun
>>
2014
>>
Quest LE
>>
Repair and Diagnosis
>>
Engine Performance
>>
System
>>
Engine Control System (Diagnostic Codes & Symptom Tests)
>>
Periodic Maintenance
>>
Ignition Timing
>>
Work Procedure
April 5, 2026:
LEMON Manuals is launched!
Read the announcement.
Work Procedure
CHECK IGNITION TIMING
Attach timing light to loop wires as shown below.
Timing light (A)
<==: Vehicle front
Fig 1: Identifying Timing Light To Loop Wires
Courtesy of NISSAN NORTH AMERICA, INC.
Check ignition timing.
: INSPECTION END
Fig 2: Checking Ignition Timing
Courtesy of NISSAN NORTH AMERICA, INC.