LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2014 >> Quest SL >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System (Diagnostic Codes & Symptom Tests) >> Periodic Maintenance >> Ignition Timing >> Work Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Work Procedure

  1. CHECK IGNITION TIMING 
    1. Attach timing light to loop wires as shown below.
      • Timing light (A)
      • <==: Vehicle front
        Fig 1: Identifying Timing Light To Loop Wires
        G07051295Courtesy of NISSAN NORTH AMERICA, INC.
    2. Check ignition timing.

      : INSPECTION END

      Fig 2: Checking Ignition Timing
      G05865153Courtesy of NISSAN NORTH AMERICA, INC.