LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2021 >> Sentra SR >> Repair and Diagnosis >> Electrical >> Charging Systems >> Charging System >> Basic Inspection >> Diagnosis And Repair Work Flow >> Work Flow (Without 165-DSS-5000P) >> Overall Sequence
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Overall Sequence

Before performing a generator test, make sure that the battery is fully charged. A 30-volt voltmeter and suitable test probes are necessary for the test.

GNSAWMIA0242GB-242Courtesy of NISSAN NORTH AMERICA, INC.