LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Peugeot >> 1982 >> 505 L4-1971cc XN >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Testing and Inspection >> Dynamic Checks >> Regulation System Full Load Operation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Regulation System Full Load Operation


Object: Check that, under full load, the OCR has a fixed value of 35% (31° to 32°).
1. Activate the switch on 8.0141 P harness, and start the engine.
2. Disconnect the vacuum hose on the vacuum switch (green reference ring). The reading on the OCR meter should be 35% (31° to 32°).
NOTE: To make the test, pinch the end of the hose.
3. If the value is different stop the engine and the fuel pumps (switch on 8.0141 p harness) and perform the following checks:


Fig. 13 Testing the full load vacuum switch:





a. Test the operation of the full load vacuum switch (5) using the hand held vacuum pump P.N. 90.31, Fig. 13.
b. Check the connection and continuity of wire 147 at pin #7 of connector (8a).