LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Pontiac >> 2002 >> Aztek FWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1312 (Battery) >> Repair Instructions >> Battery Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

WARNING: This page is about a different car, the 2003 GMC Sierra, 2003 GMC Cab & Chassis Sierra, 2003 Chevrolet Silverado, and 2003 Chevrolet Cab & Chassis Silverado. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the battery insulator, if necessary.
  2. Install the battery.
    NOTE: Refer to FASTENER NOTICE .
  3. Install the battery hold down retainer and bolt.

    Tighten 

    Tighten the bolt to 25 N.m (18 lb ft).

    Fig 1: Install Battery, Insulator, Retainer & Bolt
    G02109445Courtesy of GENERAL MOTORS CORP.
  4. Install the front end diagonal brace and bolts.

    Tighten 

    Tighten the bolts to 9 N.m (80 lb in).

    Fig 2: Install Front End Diagonal Brace & Bolts
    G02109446Courtesy of GENERAL MOTORS CORP.
  5. Connect the positive battery cable.

    Tighten 

    Tighten the bolt to 17 N.m (13 lb ft).

  6. Snap the positive battery cable cap closed.
  7. Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure (Single Battery)  or Battery Negative Cable Disconnect/Connect Procedure (Auxiliary Battery) .
    Fig 3: Connect Positive Battery Cable
    G02109447Courtesy of GENERAL MOTORS CORP.