LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Pontiac >> 2002 >> Aztek FWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 90 (Charging System) >> Trouble Shooting >> System Operation Check
April 5, 2026: LEMON Manuals is launched! Read the announcement.

System Operation Check

WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2002 GMC Yukon XL, 2002 GMC Yukon, 2002 Chevrolet Tahoe, 2002 Chevrolet Suburban, and 2002 Chevrolet Avalanche. However, it is still accessible from the selected car via links, so may be relevant.
NOTE: Before making electrical checks, visually inspect all terminals for clean, tight connections. Ensure all charging system related fuses are okay. Check generator mounting bolts and drive belt tension. Ensure battery is fully charged and in good condition prior to testing charging system. See BATTERY TESTING & INSPECTION  under ON-VEHICLE TESTING. Ensure battery cable connections are in good condition and free of corrosion. Ensure starting system is okay. See STARTERS article in ELECTRICAL.