Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install the Shift Lock Control Module/Shift Lock Solenoid assembly, then the retaining screw (2).
- Connect the electrical connector (1).
- Install the front floor console. Refer to Console Replacement - Front Floor in Instrument Panel, Gages and Console.
- Connect the negative battery cable.