Installation Procedure
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2009 GMC Savana Special, 2009 GMC Savana Camper Special, 2009 GMC Savana, 2009 Chevrolet RV Cutaway, and 2009 Chevrolet Cutaway. However, it is still accessible from the selected car via links, so may be relevant.
- Carefully align and install the EBCM (1) to the BPMV.
Do not force the components together.
- Install new EBCM bolts (1).
Tighten the bolts in a cross pattern to 3 N.m (27 lb in) .
- Connect the electrical connector to the EBCM.
- Install the brake modulator shield and the mounting nuts, if equipped, and tighten to 25 N.m (18 lb ft).
- Install the brake modulator shield mounting bolt and tighten to 25 N.m (18 lb ft).
- Lower the vehicle.
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
- Refer to Control Module References for programming and setup information.
CAUTION:
Refer to Fastener Caution
.