Installation Procedure
WARNING: This page is about a different car, the 2004 Chevrolet Corvette. However, it is still accessible from the selected car via links, so may be relevant.
- Install and route the fuse block cable through the front of dash.
- Install the battery positive fuse block cable to the stud.NOTE: Refer to Fastener Notice in Cautions and Notices.
- Install the I/P wiring harness junction block nut.
Tighten: Tighten the I/P wiring harness junction block nut to 10 N.m (89 lb in).
- Reposition the junction block nut boot.
- Snap the junction block to the bracket.
- Ensure the latches on the kick-up panel are open.
- Insert the kick-up panel lower tabs into the slots in the bracket.
- Close the panel and push the latches into the holes.
- Install the battery positive fuse block cable to the stud.
- Install the positive battery cable lead to the stud.
- Install the positive battery cable nut (1).
Tighten: Tighten the positive battery cable nut to 10 N.m (89 lb in).
- Close the stud cover on the fuse/relay center cover.
- Install the battery tray. Refer to Battery Tray Replacement .