LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Saturn >> 2002 >> SC2 Automatic, MP6 >> Repair and Diagnosis >> External Pages >> Different car >> Section 162 (Battery, Charging System & Starting System) >> Repair Instructions >> Battery Positive Fuse Block Cable Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

WARNING: This page is about a different car, the 2004 Chevrolet Corvette. However, it is still accessible from the selected car via links, so may be relevant.
    Fig 1: I/P Wiring Harness Junction Block & Nut
    GM675311Courtesy of GENERAL MOTORS CORP.
  1. Install and route the fuse block cable through the front of dash.
  2. Install the battery positive fuse block cable to the stud.
    NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the I/P wiring harness junction block nut.

    Tighten:  Tighten the I/P wiring harness junction block nut to 10 N.m (89 lb in).

  4. Reposition the junction block nut boot.
  5. Snap the junction block to the bracket.
  6. Fig 2: Kick-Up Panel Latches & Multi-Use Relay Bracket
    GM71195Courtesy of GENERAL MOTORS CORP.
  7. Ensure the latches on the kick-up panel are open.
  8. Insert the kick-up panel lower tabs into the slots in the bracket.
  9. Close the panel and push the latches into the holes.
  10. Fig 3: Fuse/Relay Center Stud & Positive Battery Cable Lead
    GM675309Courtesy of GENERAL MOTORS CORP.
  11. Install the battery positive fuse block cable to the stud.
  12. Install the positive battery cable lead to the stud.
  13. Install the positive battery cable nut (1).

    Tighten:  Tighten the positive battery cable nut to 10 N.m (89 lb in).

  14. Close the stud cover on the fuse/relay center cover.
  15. Install the battery tray. Refer to Battery Tray Replacement .