LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Saturn >> 2008 >> Sky Red Line, Standard >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Diagnostic Information & Procedures >> DTC P0622 >> Circuit/System Testing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit/System Testing

  1. Ignition OFF, disconnect the harness connector at the generator.
  2. Ignition ON, engine OFF, connect a test lamp to B+ and repeatedly probe the generator field duty cycle circuit X1 terminal C, harness side while monitoring the scan tool ECM GEN-F Terminal Signal Parameter. It should change from 0 percent to above 95 percent.
    • If the parameter was not affected by the test lamp, test the circuit for a short to voltage, short to ground, or an open/high resistance. If the circuit tests normal, replace the ECM.
  3. If the circuit tests normal replace the generator.