LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Saturn >> 2009 >> Vue Red Line, AWD >> Repair and Diagnosis >> External Pages >> Different car >> Section 1190 (Hybrid Control System) >> Diagnostic Information and Procedures >> DTC P0AA2 >> Circuit/System Testing
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Circuit/System Testing

WARNING: This page is about a different car, the 2008 Saturn Vue. However, it is still accessible from the selected car via links, so may be relevant.
CAUTION: To help avoid personal injury, additional precautions must be taken prior to working on the generator control module or the generator starter. After removing the 36V battery cables from the generator battery, remove both engine wiring harness connectors from the generator control module. Wait at least 5 minutes and then remove the generator control module cover. Verify voltage levels at all 36V, 12V, and 3-phase connections, are less than 3 volts using a DMM before proceeding.
CAUTION: To help avoid personal injury, be careful when working in the vicinity of the generator battery disconnect control module. Internal components will still be live, 36V potential, even when the cover has been opened or removed.
  1. If other DTCs are set diagnose those first.
  2. Cycle the ignition switch from OFF to RUN several times.