Transmission Control Cable: Installation
- INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
- Install the control cable with the 2 bolts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Install the clamp to the control cable.
- Install the clamp to the body with the 2 nuts.
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- Connect the control cable to the control cable bracket, and install 2 new clips.
- Connect the control cable to the transaxle, and install the 2 washers and 2 clips.
- Install the control cable with the 2 bolts.
- CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
- Connect the ends of the control cable and install the 2 clips to the shift lever.
- Turn the lock nuts of the shift cable 270° counterclockwise, and hold them in that position.
- Install the shift cable while holding them.
- Check that the cable are installed securely.
- Push in the cable locks of the shift cable and select cable.
- INSTALL FRONT NO. 1 FLOOR HEAT INSULATOR
Torque: 5.5 N*m (56 kgf*cm, 49 in.*lbf)
- INSTALL EXHAUST PIPE ASSEMBLY (See INSTALLATION )
- INSTALL CENTER AIRBAG SENSOR ASSEMBLY
- INSTALL AIR CONDITIONING UNIT ASSEMBLY (See INSTALLATION )
- INSTALL REAR CONSOLE BOX ASSEMBLY (See INSTALLATION )
- INSTALL REAR CONSOLE PANEL SUB-ASSEMBLY UPPER (See INSTALLATION )
- INSTALL CONSOLE PANEL UPPER (See INSTALLATION )
- INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see INITIALIZATION ).
- CHECK SRS WARNING LIGHT
- Check the SRS warning light (see DIAGNOSIS SYSTEM ).