Throttle Body: Installation: Installation
- INSTALL THROTTLE BODY ASSEMBLY
- Install a new gasket onto the intake manifold.
- Install the throttle body assembly with the 2 bolts and 2 nuts.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 10 N*m ( 102 kgf*cm, 7 in.*lbf)
- Connect the water by-pass hose and the No. 2 water by-pass hose.
- Connect the throttle body assembly connector.
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE
- Install air cleaner cap sub-assembly with hose and lock the 2 clamps.
- Tighten the hose clamp to the specified torque.
Torque: 3.0 N*m ( 31 kgf*cm, 27 ft.*lbf)
- Connect the No. 2 ventilation hose.
- Connect the wire harness clamp and mass air flow meter connector.
- ADD ENGINE COOLANT . Refer to REPLACEMENT - Step 2
- INSPECT FOR COOLANT LEAK . Refer to ON-VEHICLE INSPECTION - Step 1
- INSTALL NO. 2 CYLINDER HEAD COVER . Refer to INSTALLATION - Step 3