Intake Manifold: Assembly
- Install the intake manifold to tumble generator assembly.NOTE: Use a new gasket.CAUTION: This work should be done on cylinder head. (Do not use gasket for the mating surface of cylinder head and intake manifold at this time.)
- Temporarily tighten (a) - (b) in alphabetical order.
- Tighten (e) - (k) to 5 N.m (0.5 kgf-m, 4 ft-lb).
- Tighten (a) - (d) and (I) - (o) to 10 N.m (1.0 kgf-m, 7ft-lb).
- Tighten (e) - (g) to 25 N.m (2.6 kgf-m, 18 ft-lb).
- Tighten (h) - (k) to 25 N.m (2.6 kgf-m, 18 ft-lb).
- Loosen (a) - (d) and (I) - (o) to remove.
- Tighten the bolt which installs pressure regulator on intake manifold.
Tightening torque:
5 N.m (0.5 kgf-m, 3.6 ft-lb)
- Tighten the bolt which installs the fuel pipes on intake manifold.
Tightening torque:
5 N.m (0.5 kgf-m, 3.6 ft-lb)
- Connect the fuel injector pipe to fuel hose, and tighten the clamp screw.NOTE: Tighten the clamp screw as shown in Fig 3 .
L:2 - 5 mm (0.08 - 0.20 in)
Tightening torque:
1.5 N.m (0.15 kgf-m, 1.1 ft-lb)
- LH side
- RH side
- Install the fuel injectors.
- Tighten the bolts which install injector pipe on intake manifold.
- RH side
Tightening torque:
19 N.m (1.9 kgf-m, 14 ft-lb)
Courtesy of SUBARU OF AMERICA, INC.
- LH side
Tightening torque:
19 N.m (1.9 kgf-m, 14 ft-lb)
Courtesy of SUBARU OF AMERICA, INC.
Tightening torque:
5 N.m (0.5 kgf-m, 3.6 ft-lb)
- Hold the engine harness by harness band clips.
- Install the purge control solenoid valve. < Ref. to INSTALLATION , Purge Control Solenoid Valve. >
- Install the tumble generator valve actuator. < Ref. to , INSTALLATION , Tumble Generator Valve Actuator. >
- Connect the connectors (A) to fuel injector.
- Hold the engine harness to injector pipe by clip (B).
- Connect the pressure regulator vacuum hose to intake manifold.
- Install the fuel pipe protector RH.
Tightening torque:
19 N.m (1.9 kgf-m, 14 ft-lb)
- Install the fuel pipe protector LH.
Tightening torque:
19 N.m (1.9 kgf-m, 14 ft-lb)
- Install the PCV pipe.
Tightening torque:
5 N.m (0.5 kgf-m, 3.6 ft-lb)
- Install the EGR valve. < Ref. to , INSTALLATION , EGR Valve. >
- Install the throttle body to intake manifold. < Ref. to , INSTALLATION , Throttle Body. >
- Install the ignition coil & ignitor assembly. < Ref. to INSTALLATION , Ignition Coil and Ignitor Assembly. >
- Install the engine ground terminal to intake manifold.
Tightening torque:
19 N.m (1.9 kgf-m, 14 ft-lb)
- LH side
- RH side