LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2005 >> Outback XT, Standard >> Repair and Diagnosis >> Electrical >> Charging Systems >> Starting/Charging Systems (H4SO) >> Battery >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Starting/Charging Systems (H4SO): Battery: Installation

Install in the reverse order of removal.

Tightening torque: 

3.4 N.m (0.35 kgf-m, 2.5 ft-lb) 

NOTE:
  • Clean the battery cable terminals and apply grease to retard the formation of corrosion.
  • Connect the positive (+) terminal, and then connect the negative (-) terminal of battery.
  • Initial diagnosis of electronic control throttle is performed after battery installation. For this reason, start the engine after 10 seconds or more have elapsed since the ignition switch was turned to ON.