LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2005 >> Outback XT, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 28 (A/T & M/T Control Systems) >> Select Cable >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Select Cable: Installation

WARNING: This page is about a different car, the 2005 Subaru Baja. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install the select cable to base plate.

    Tightening torque: 

    18 N.m (1.8 kgf-m, 13.0 ft-lb) 

  2. Install the select cable to range select lever.
  3. Install the plate assembly to transmission.

    Tightening torque: 

    T: 24.5 N.m (2.5 kgf-m, 18.1 ft-lb) 

    Fig 1: Installing Select Cable And Plate Assembly
    G03750277Courtesy of SUBARU OF AMERICA, INC.
  4. Install the washer and snap pin to range select lever.
    Fig 2: Installing Washer And Snap Pin To Range Select Lever
    G03750278Courtesy of SUBARU OF AMERICA, INC.
  5. Move the select lever to "N" position, then adjust the select cable position. < Ref. to , ADJUSTMENT , Select Cable. >
  6. Install the heat shield cover. (If equipped)
  7. Install the front and center exhaust pipe. (Non-TURBO model)

    < Ref. to INSTALLATION , Front Exhaust Pipe. >

  8. Install center exhaust pipe. (TURBO model)

    < Ref. to INSTALLATION , Center Exhaust Pipe. >