VDC Control Module & Hydraulic Control Unit (VDCCM&H/U): Installation
- Install the VDCCM&H/U bracket.
Tightening torque: 33 N.m (3.3 kgf-m, 24 ft-lb)
- Install the VDCCM&H/U to the bracket.
Tightening torque: 7.5 N.m (0.76 kgf-m, 5.5 ft-lb)
CAUTION: Attach so that the protrusion of the stud bolt is at the position shown in the figure. - Connect the brake pipes to their correct VDCCM&H/U positions.
Tightening torque:
< Refer to FRONT BRAKE PIPES AND HOSE , COMPONENT, General Description. >
- Connect the VDCCM&H/U connectors.NOTE:
- Be sure to remove all foreign matter from inside the connector before connecting.
- Make sure the VDCCM&H/U connector is securely locked.
- Bleed air from the brake system.