LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2013 >> Outback Base, Standard Trans >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 12 (Starting System & Charging System (H6DO)) >> Battery >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Section 12 (Starting System & Charging System (H6DO)): Battery: Installation

WARNING: This page is about a different variant/trim than selected.

Install in the reverse order of removal.

Tightening torque: 3.5 N.m (0.4 kgf-m, 2.6 ft-lb) 

NOTE:
  • Clean the battery cable terminals and apply grease to retard the formation of corrosion.
  • Connect the positive (+) terminal, and then connect the negative (-) terminal of the battery.
  • After the battery is installed, initial diagnosis of the electronic throttle control is performed. Wait for 10 seconds or more after turning the ignition switch to ON, and then start the engine.