LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 2017 >> Outback 2.5i >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (Fuel Injection System (H6DO)) >> Main Relay >> Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Main Relay: Inspection

WARNING: This page is about a different variant/trim than selected.
  1. Check that the main relay has no deformation, cracks or other damages.
  2. Measure the resistance between main relay terminals.
    Fig 1: Measuring Resistance Between Main Relay Terminals
    G10263639Courtesy of SUBARU OF AMERICA, INC.
    Terminal No. Standard
    1 and 3 1 MΩ or more
    2 and 4 80.55 - 98.45 Ω (when 20°C (68°F))
  3. Connect battery positive terminal to terminal No. 2 and battery ground terminal to terminal No. 4, and measure the resistance between the main relay terminals.
Fig 2: Connecting Battery Positive Terminal To Terminal No. 2 And Battery Ground Terminal To Terminal No. 4
G10262212Courtesy of SUBARU OF AMERICA, INC.
Terminal No. Standard
1 and 3 Less than 1 Ω