Backup Unit: Installation
- Install the backup unit.
Tightening torque:
7.5 N.m (0.8 kgf-m, 5.5 ft-lb)
- Install the tray center UPR.
- Install the cover assembly front and the console box assembly.
- Install the heater control panel assembly.
- Connect the battery ground terminal. Ref. to REPAIR CONTENTS>NOTE>BATTERY .