LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2002 >> Esteem GLX Sedan L4-1.8L >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Relays and Modules - Computers and Control Systems >> Main Relay (Computer/Fuel System) >> Testing and Inspection
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Main Relay (Computer/Fuel System): Testing and Inspection

1. Disconnect negative cable at battery.




2. Remove main relay (1) from relay box.




3. Check resistance between each two terminals.

If check results are as specified, proceed to next operation check.

If not, replace.

Main relay resistance
Between "1" and "2": infinity (infinity)
Between "3" and "4": 70 - 110 Ohm




4. Check that there is continuity between terminals "1" and "2" when battery is connected to terminals "3" and "4". If found defective, replace.