LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Suzuki >> 2012 >> Equator Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 14 (Automatic Transmission) >> Repair Instructions >> Shift Control Cable Bracket Replacement >> Installation Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Installation Procedure

WARNING: This page is about a different car, the 2007 Suzuki XL7. However, it is still accessible from the selected car via links, so may be relevant.
Fig 1: Identifying Shift Control Cable Bracket (2 Of 2)
G04845918Courtesy of SUZUKI OF AMERICA CORP.
  1. Install the transaxle shift control bracket.
    CAUTION: Refer to FASTENER NOTICE .
  2. Install the transaxle shift control bracket.

    Tightening torque 

    Tighten the bolts to 25 N.m (18 lb ft)  .

    Fig 2: Identifying Shift Control Cable, Cable Bracket & Transaxle Range Switch Lever
    G04845919Courtesy of SUZUKI OF AMERICA CORP.
  3. Install the shift control cable (2) to the shift control cable bracket (3). Ensure the shift control cable retaining tabs fully engage the shift control cable bracket.
  4. Connect the shift control cable (1) to the transaxle range switch lever (4).
  5. Install the battery tray. Refer to BATTERY TRAY REPLACEMENT .