LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2002 >> Land Cruiser >> Repair and Diagnosis >> Body & Frame >> Body, Cab Control Systems >> Body Control Systems - Diagnostics >> Circuit Inspection >> Park/Neutral Position Switch Circuit >> Inspection Procedure
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Inspection Procedure

  1. Check A/T shift operation  .

    Check that the A/T shift operates normally.

    1. OK: Go to next step.
    2. NG: Proceed to AT troubleshooting (See TROUBLE SHOOTING ).

  2. Check harness and connector between Body ECU and park/neutral position switch (See  HOW TO TROUBLESHOOT ECU CONTROLLED SYSTEMS  )  .
    1. OK: Check and replace Body ECU (See HOW TO TROUBLESHOOT ECU CONTROLLED SYSTEMS ).
    2. NG: Repair or replace harness or connector.