Throttle Body: Installation
- INSTALL THROTTLE BODY ASSEMBLY
- Install a new gasket to the intake air connector.
- Install the throttle body with the 2 bolts and 2 nuts.
Torque: 11 N*m (112 kgf*cm, 8 ft.*lbf)
- Connect the water by-pass hose No. 3.
- Connect the water by-pass hose No. 2.
- Connect the throttle control motor & throttle position sensor connector.
- INSTALL INTAKE AIR RESONATOR
- INSTALL AIR CLEANER ASSEMBLY (See INSTALLATION )
- INSTALL AIR CLEANER INLET ASSEMBLY
- CHECK CONNECTION OF VACUUM HOSE
- ADD ENGINE COOLANT (See COOLANT )
- CHECK FOR ENGINE COOLANT LEAKS
- INSTALL V-BANK COVER SUB-ASSEMBLY
- Fit the 2 retainers and install the V-bank cover.
- Using a 5 mm socket hexagon wrench 5, tighten the 3 nuts.
Torque: 7.9 N*m (81 kgf*cm, 70 in.*lbf)
- INSTALL FRONT SUSPENSION UPPER BRACE CENTER
- Install the upper brace with the 2 nuts.
Torque: 80 N*m (815 kgf*cm, 59 ft.*lbf)
- Install the upper brace with the 2 nuts.