LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Toyota >> 2007 >> 4Runner Limited, 4.7 T, AWD >> Repair and Diagnosis >> Transmission >> Transmission Control Systems >> Automatic Transmission Control System - A750F >> Shift Lever Assembly >> Installation
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Shift Lever Assembly: Installation

  1. INSTALL FLOOR SHIFT ASSEMBLY 
    1. Install the floor shift assembly with the 4 bolts.

      Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf) 

      Fig 1: Identifying Floor Shift Assembly Bolts
      G04963391Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Connect the transmission control cable with the lock plate.
    3. Connect the 2 clamps and 2 connectors.
  2. ADJUST SHIFT LEVER POSITION 

    HINT:

    (See ADJUSTMENT  )

  3. INSTALL REAR CONSOLE BOX ASSEMBLY 
  4. INSTALL NO.2 CONSOLE UPPER PANEL GARNISH 
  5. INSTALL NO.1 CONSOLE UPPER PANEL GARNISH 
  6. INSTALL UPPER CONSOLE PANEL SUB-ASSEMBLY 
  7. INSTALL CONSOLE UPPER REAR PANEL SUB-ASSEMBLY 
  8. INSPECT SHIFT LEVER POSITION 

    HINT:

    (See ADJUSTMENT  )