Network Gateway Ecu: Installation
- INSTALL NETWORK GATEWAY ECU
- Install the network gateway ECU with the bolt.
- Connect the connector.
- INSTALL INSTRUMENT PANEL SUB-ASSEMBLY
- Install the instrument panel (See INSTALLATION ) .
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
- PERFORM INITIALIZATION
- Perform initialization (see
INITIALIZATION
).NOTE: Certain systems need to be initialized after disconnecting and reconnecting the cable from the negative (-) battery terminal.
- Perform initialization (see
INITIALIZATION
).