Integration Relay: Installation
- INSTALL INTEGRATION RELAY
- Connect the 3 connectors.
- Attach the integration relay to the engine room relay block.
- INSTALL RELAY BLOCK COVER NO. 1
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)