Throttle Body: Installation
- INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY
- Install a new gasket onto the intake manifold.
- Install the throttle with motor body with the 2 bolts and 2 nuts.
Torque: 9 N*m (92 kgf*cm, 80 in.*lbf)
- Connect the water by-pass hose.
- Connect the water by-pass hose No. 2.
- Connect the throttle motor connector.
- INSTALL INTAKE AIR CONNECTOR
- Install the intake air connector with the 3 bolts.
Torque: 8 N*m (82 kgf*cm, 71 in.*lbf)
- Tighten the 2 hose clamp bolts.
Torque: 5 N*m (51 kgf*cm, 44 in.*lbf)
- Connect the vacuum hose.
- Connect the ventilation hose No. 2.
- Connect the vacuum hose.
- Engage the wire harness clamp.
- Connect the pressure sensor connector.
- Install the intake air connector with the 3 bolts.
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 3.9 N*m (40 kgf*cm, 35 in.*lbf)
- ADD ENGINE COOLANT (See COOLANT )
- CHECK FOR ENGINE COOLANT LEAKAGE (See ON-VEHICLE INSPECTION )
- INSTALL ENGINE UNDER COVER SUB-ASSEMBLY NO.1 (for 4WD and Pre-Runner)
- PERFORM INITIALIZATION NOTE: Perform the following procedure after replacing the ECM, throttle body assembly or any throttle body components or after cleaning the throttle body.
- Disconnect the cable from the negative (-) battery terminal. Wait at least 60 seconds and reconnect the cable.
- Turn the ignition switch to the ON position without operating the accelerator pedal.NOTE: If the accelerator pedal is operated, perform the above steps again.
- Connect the tester to the DLC3 and clear the DTCs (See DTC CHECK/CLEAR ).
- Start the engine and check that the MIL is not illuminated and that the idle speed is within the specified range when the A/C is switched off after the engine is warmed up.
Standard
ENGINE IDLE SPEED CHARTCondition Engine Idle Speed A/C switched off 600 to 700 rpm NOTE:- Be sure to perform this step with all accessories off.
- Make sure that the shift lever is in N or P.
- Enter the following menus: Powertrain/Engine and ECT/Data List/Throttle Pos. Sensor Output. Fully depress the accelerator pedal and check that the value is 60% or more.
- Perform a road test and confirm that there are no abnormalities.