Ignition Coil And Spark Plug: Removal: Removal
- REMOVE NO. 2 ENGINE UNDER COVER . Refer to REMOVAL - Step 4
- REMOVE V-BANK COVER SUB-ASSEMBLY . Refer to REMOVAL - Step 22
- REMOVE AIR CLEANER HOSE ASSEMBLY . Refer to REMOVAL - Step 8
- REMOVE AIR CLEANER ASSEMBLY . Refer to REMOVAL - Step 24
- DISCONNECT WATER BY-PASS PIPE ASSEMBLY
- Remove the 2 bolts and disconnect the water by-pass pipe from the cylinder head cover and timing chain cover.
- Remove the 3 bolts and disconnect the water by-pass pipe from the cylinder head cover.
- REMOVE IGNITION COIL ASSEMBLY
- Disconnect the 8 ignition coil connectors.
- Remove the 8 bolts and 8 ignition coils.
- REMOVE SPARK PLUG
- Remove the 8 spark plugs.