Engine Control System (Except Plug-In) (Service Information): ECM: Installation: Installation
- INSTALL ECM
- Install the ECM with the 2 bolts.
Torque: 13 N*m (133 kgf*cm, 10 ft.*lbf)
- Install the 2 wire harness clamps.
- Connect the 2 ECM connectors.
- Connect the 2 ECM connectors and lower the 2 levers.
NOTE:
- When connecting the connectors, make sure that dirt, water or other foreign matter does not get caught between the connectors and other parts.
- Make sure that the 2 levers are securely locked.
- Install the 2 wire harness clamps.
- Connect the 2 ECM connectors and lower the 2 levers.
- Install the No. 2 engine room wire with the bolt.
Torque: 8.3 N*m (85 kgf*cm, 73 in.*lbf)
- Slide the side cover down and engage the 2 claws to install it.
- Slide the engine room wire harness down and engage the 2 claws to install it.
- Connect the 3 wire harness connectors.
- Install the No. 1 relay block cover.
- Install the ECM with the 2 bolts.
- INSTALL INVERTER RESERVE TANK ASSEMBLY
- Install the inverter reserve tank assembly with the 2 bolts.
Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
Torque: 18 N*m (184 kgf*cm, 13 ft.*lbf)
- Install the inverter reserve tank assembly with the 2 bolts.
- CONNECT CABLE TO AUXILIARY BATTERY NEGATIVE TERMINAL
- INSTALL REAR NO. 3 FLOOR BOARD . Refer to INSTALLATION - Step 58
- INSTALL REAR DECK FLOOR BOX . Refer to INSTALLATION - Step 59
- INSTALL REAR NO. 2 FLOOR BOARD (for Separate Type) . Refer to INSTALLATION - Step 60
- PERFORM INITIALIZATION
HINT:
Initialization cannot be completed by only disconnecting and reconnecting the cable of the negative (-) battery terminal.
- Perform Initialization when replacing the ECM See step 10.