LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Volkswagen >> 2012 >> Routan SE >> Repair and Diagnosis >> Electrical >> Body Electrical >> Body Exterior DTC Based Diagnostics - Power Liftgate Module >> 00 General, Technical Data >> Power Liftgate Module >> B1956 - Power Liftgate Latch Release Excessive Time >> Notes
April 5, 2026: LEMON Manuals is launched! Read the announcement.

B1956 - Power Liftgate Latch Release Excessive Time: Notes

Fig 1: Power Liftgate Latch Release Excessive Time
GWWUS74419Courtesy of VOLKSWAGEN GROUP OF AMERICA, INC.

For a complete wiring diagram, refer to appropriate Wiring Diagram

Possible Causes
BINDING LIFTGATE
LOW BATTERY VOLTAGE
LATCH NOT IN HOME POSITION
Q84 LIFTGATE LATCH CINCH DRIVER CIRCUIT OPEN OR HIGH RESISTANCE
Q85 LIFTGATE LATCH RELEASE DRIVER CIRCUIT OPEN OR HIGH RESISTANCE
G78 LIFTGATE SWITCH SENSE CIRCUIT OPEN OR HIGH RESISTANCE
Q901 LOGIC GROUND CIRCUIT OPEN OR HIGH RESISTANCE
LATCH ASSEMBLY

Test Step 1 - DTC Present

NOTE:

If there are any other power liftgate DTCs present, repair them before proceeding with this test.

NOTE:

Ensure the battery is fully charged and serviceable before proceeding.

Does the scan tool display B1956 - Power Liftgate Latch Release - Excessive Time?

Yes

No