LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Volkswagen >> 2013 >> Passat TDI SE, Standard Trans >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> 2.0L - Generic Scan Tool - Engine Code: CKRA >> St Generic Scan Tool >> Diagnosis And Testing >> Diagnostic Procedures >> Power Supply Relay 2, Checking >> Checking Wiring
April 5, 2026: LEMON Manuals is launched! Read the announcement.

Checking Wiring

-- Remove the engine control module. Refer to the service information for removal and installation procedures.

-- Using a multimeter, measure the resistance of the circuit between the power supply relay Power Supply Relay 2 (terminal 15) -J681- and the engine control module Engine Control Module (ECM) -J623-. Refer to the applicable wiring diagram.

Power Supply Relay 2 (terminal 15) -J681- electrical harness connector terminal Engine Control Module (ECM) -J623- electrical connector terminal or specified location
2 Engine Control Module (ECM) J623 fuse in the appropriate fuse holder. Refer to the appropriate wiring diagram.
8 Engine Control Module (ECM) J623 fuse in the appropriate fuse holder. Refer to the appropriate wiring diagram.
6 Vehicle Electrical System Control Module -J519- Refer to the appropriate wiring diagram.
4 Chassis ground

Specified value: 1.5 Ω Max.

If the specification was not obtained:

-- Check the wires for a short circuit to each other, a short to battery voltage, and a short to ground.

-- Check the electrical harness connector for damage, corrosion, loose or broken terminals.

-- Repair as necessary.

If no malfunction is found in the wiring and voltage supply was OK:

-- Replace the engine control module Power Supply Relay 2 (terminal 15) -J681-.