Connecting The Breakout Box And Checking The Ground Terminals
It is important that the breakout box is connected according to CONNECTING THE BREAKOUT BOX, POWER SEAT MODULE (PSM) and the ground terminals are checked according to CHECKING GROUND POINTS to before the readings are taken.